Report: Charging differentials for 132kV generation

15/10/21 | Grid & Systems

This report provides analysis to identify and quantify any differential in network charges paid by small (<100MW) generators connected to the 132kV transmission network in Scotland compared to those connected to the 132kV distribution network in England and Wales.

Download this document

731 KB, pdf